Monday, June 16, 2008


Sorry its so blurry, but that's me behind the front counter!


this is the side view and change rooms

This is the top view of the employee room and stock room



These are the top and back views

Pictures



These are front view pictures of my store. They're really blurry but bear with me!

Whooooo! day 15

today in class i worked on the rough copy of my report. now i am finishing my blog (duh), typing up my report, doing the sample board and adding finishing touches to the model

Day 14...ITS FRIDAY THA 13TH!!!

Yesterday i worked on my model for a while but then my manager called and asked me to work for a few hours...
today i printed out everything i needed so i could finish the assignment on the weekend. there was nothing much i could do in class...

Day thurteen

I didn't really do much in class today, i have the biggest headache :(
but im going to take my materials home to finish my model

EVLEWT YAD

Yesterday I made the walls 10cm tall (what the maximum was) but then i decided they were way to tall so i lowered it to 5cm. this looks a lot more realistic.

D/a/y/1/1/

Today Mr.Bishop helped me print my floor plan out in the right size. We went down to 99 and i cut out my store. I took home a couple peices of the thicker paper and cut out my walls and ceilings.

Le dixième jour

I went back to sofplan and finished the details on my store. it surprisingly looks like an actual clothing store :]

it just occured to me that i have to start building :[

Fine, its day nine

I took a break from sofplan and decided on my LEED materials

Day 8^)

today i did the unbearable...i used sofplan i drew the outline of my store. it looks good. but it was defiantly painful.

Day 711 11 11 come to pizza pizza HEY HEY HEY

Today i added details to my store such as: changerooms, sale racks and mirrors. I also looked at that nifty LEED stuff...

Monday, June 2, 2008

day xis

Today is day 5! I drew out a floorplan (to scale this time)...its crazy! so crazy it just might work...

i didnt keep the cone idea :(

Thursday, May 29, 2008

day 5? YES, its day five

today i started making the floorplan for my clothing store! the lot i was givin is 10m x 25m which makes a long rectangle. this is the perfect shape and size for a small town clothing store :)
after drawing it out, i realized i should make it in a shape other than a rectangle. a cone might work.

so i drew out my store in the cone shape. it looks really cool, but i figured out that i forgot about the whole scaling situation...now i have to start over...

day four /4 /for

Hmmm. so not every body likes surf/ skate clothing so there will be another store in town called XS which will be selling a totally different style of clothing. this is important so that not everybody is dressed the same in a small town.

day THREEE

So a clothing store needs clothes. this means I have to decide what kinds I will be selling. My store will sell the clothes that I wear, which are skate/ surf brands.

day two

Today i took pictures of everyone in the class. Bryan took a picture of me and i had to photoshop it into scale for my store :) This took a while since i had to take out the background and my shoes were the same colour as the floor, therefore photoshop kept deleting my shoes!

Day one

I chose to make a clothing store for my summative :] its going to be gggreat!